Drilldown: ShipData
ShipData > top speed:
60-100
& material cost :
$183,713 or
$256,685 or
$60,490 or
$751,036 (9/16/2023)
& loyalty required:
7% + Level 2 Starbase
Use the filters below to narrow your results.
Showing below up to 1 result in range #1 to #1.